Triple
T14942836
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ocean Cay |
E372574
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cruise destination |
C19644
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cruise destination Context triple: [Ocean Cay, instanceOf, cruise destination]
-
A.
coastal destination
chosen
A coastal destination is a travel location situated along a sea or ocean shoreline, offering beach-related recreation, scenic waterfront views, and marine-based activities.
-
B.
trip-planning add-on
A trip-planning add-on is a supplementary tool or module that integrates with existing platforms to help users organize, optimize, and customize their travel itineraries.
-
C.
trip planning platform
A trip planning platform is a digital service that helps users research, organize, and book all aspects of their travel—such as transportation, accommodations, activities, and itineraries—in one integrated place.
-
D.
cruise line
A cruise line is a company that owns, operates, and markets cruise ships, providing passengers with transportation, accommodations, entertainment, and other vacation services at sea and in ports of call.
-
E.
cruise ship
A cruise ship is a large passenger vessel designed for leisure voyages, offering accommodations, dining, entertainment, and recreational activities while traveling between destinations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cc9da0c81908d583ca3f63a3908 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 2:38 a.m.