Triple

T14938526
Position Surface form Disambiguated ID Type / Status
Subject Upper Karnali Hydropower Project E372459 entity
Predicate relatedProject P2830 FINISHED
Object Upper Karnali Storage Project E372459 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Karnali Storage Project | Statement: [Upper Karnali Hydropower Project, relatedProject, Upper Karnali Storage Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Upper Karnali Storage Project
Context triple: [Upper Karnali Hydropower Project, relatedProject, Upper Karnali Storage Project]
  • A. Upper Karnali Hydropower Project chosen
    The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
  • B. Upper Bhote Koshi Hydroelectric Project
    The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
  • C. Dasu Hydropower Project area
    The Dasu Hydropower Project area is a major hydroelectric development site on the Indus River in Pakistan’s Kohistan District, planned to generate significant power as part of the country’s long-term energy and water management strategy.
  • D. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • E. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cc9da0c81908d583ca3f63a3908 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded64904d88190b6b4140da8e8199d completed April 15, 2026, 12:05 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe968d71dc81909b76551f9cd9ebab completed May 9, 2026, 2:06 a.m.
Created at: April 10, 2026, 2:38 a.m.