Triple

T1493617
Position Surface form Disambiguated ID Type / Status
Subject Palace Embankment E29637 entity
Predicate instanceOf P0 FINISHED
Object embankment C5438 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: embankment
Context triple: [Palace Embankment, instanceOf, embankment]
  • A. seawall
    A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
  • B. earthwork chosen
    An earthwork is a large-scale construction or artistic formation made by shaping, moving, or arranging soil, rock, and other natural materials in the landscape.
  • C. line of fortifications
    A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
  • D. pond
    A pond is a small, often still body of water, natural or artificial, that supports aquatic life and reflects its surrounding environment.
  • E. ridge
    A ridge is a long, narrow elevated landform or crest that typically forms a continuous raised line between lower areas on either side.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498dba1d8819093b46a3a8d2485f1 completed March 1, 2026, 7:51 p.m.
Created at: March 1, 2026, 8:12 p.m.