Triple
T14911560
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Trylon |
E371273
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | demolished building and structure |
C16762
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: demolished building and structure Context triple: [Trylon, instanceOf, demolished building and structure]
-
A.
demolished building site
chosen
A demolished building site is an area where a structure has been recently torn down, typically characterized by rubble, exposed foundations, construction equipment, and preparations for clearance or redevelopment.
-
B.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
C.
unbuilt building
An unbuilt building is a fully conceived architectural design that exists only in plans, models, or visualizations and has not yet been constructed in physical form.
-
D.
building section
A building section is a vertical cut-through representation of a structure that reveals its internal arrangement, construction elements, and spatial relationships from foundation to roof.
-
E.
deconstructivist building
A deconstructivist building is an architectural structure characterized by fragmented forms, non-linear geometry, and an apparent sense of controlled chaos that challenges traditional notions of harmony and stability.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cc7ea3481908228b5acb7d06f12 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 2:26 a.m.