Triple

T14905160
Position Surface form Disambiguated ID Type / Status
Subject NYRR 9+1 program E360110 entity
Predicate instanceOf P0 FINISHED
Object marathon entry program C18039 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: marathon entry program
Context triple: [NYRR 9+1 program, instanceOf, marathon entry program]
  • A. road running race
    A road running race is a competitive or recreational footrace held on paved public roads over a specified distance, such as 5K, 10K, half marathon, or marathon.
  • B. mountain running race
    A mountain running race is a competitive event where participants run over challenging mountainous terrain, often involving steep ascents, descents, and varying trail conditions at higher altitudes.
  • C. endurance event chosen
    An endurance event is a prolonged physical or mental challenge designed to test participants’ stamina, resilience, and ability to perform over an extended period.
  • D. endurance walking event
    An endurance walking event is a long-distance, time-limited walking competition or challenge in which participants aim to cover significant distances on foot, testing physical stamina and mental resilience.
  • E. elite training program
    An elite training program is a highly selective, intensive curriculum designed to rapidly develop top-tier skills and performance in a specific field for a small group of exceptional participants.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827980cbc8190a0c569ae3940a1d9 completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 2:12 a.m.