Triple

T14901005
Position Surface form Disambiguated ID Type / Status
Subject M60 motorway E360001 entity
Predicate hasJunction P1018 FINISHED
Object Junction 4a
Junction 4a is a numbered interchange on the M60 motorway in Greater Manchester, connecting local roads to the orbital route around Manchester.
E1126969 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Junction 4a | Statement: [M60 motorway, hasJunction, Junction 4a]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Junction 4a
Context triple: [M60 motorway, hasJunction, Junction 4a]
  • A. Junction 3a
    Junction 3a is a numbered interchange on the M60 motorway in Greater Manchester, England, providing access between the orbital route and local roads.
  • B. Junction 4
    Junction 4 is a junction on England’s M55 motorway, serving as one of the key access points between the motorway and the local road network near Blackpool.
  • C. Junction 4
    Junction 4 is an interchange on the M60 motorway in Greater Manchester, England, connecting the orbital route with local roads and nearby urban areas.
  • D. Junction 6
    Junction 6 is an interchange on England’s M58 motorway connecting local roads to the regional motorway network.
  • E. Junction
    Junction was the former name of the city now known as Englewood in Montgomery County, Ohio.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Junction 4a
Triple: [M60 motorway, hasJunction, Junction 4a]
Generated description
Junction 4a is a numbered interchange on the M60 motorway in Greater Manchester, connecting local roads to the orbital route around Manchester.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Junction 4a
Target entity description: Junction 4a is a numbered interchange on the M60 motorway in Greater Manchester, connecting local roads to the orbital route around Manchester.
  • A. Junction 3a
    Junction 3a is a numbered interchange on the M60 motorway in Greater Manchester, England, providing access between the orbital route and local roads.
  • B. Junction 4
    Junction 4 is a junction on England’s M55 motorway, serving as one of the key access points between the motorway and the local road network near Blackpool.
  • C. Junction 4 chosen
    Junction 4 is an interchange on the M60 motorway in Greater Manchester, England, connecting the orbital route with local roads and nearby urban areas.
  • D. Junction 6
    Junction 6 is an interchange on England’s M58 motorway connecting local roads to the regional motorway network.
  • E. Junction
    Junction was the former name of the city now known as Englewood in Montgomery County, Ohio.
  • F. None of above.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827980cbc8190a0c569ae3940a1d9 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69ded609bf68819099ca3aa3fe1acadc completed April 15, 2026, 12:04 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe7e83418081908280a9ed8ddb9fd7 completed May 9, 2026, 12:23 a.m.
NEDg Description generation batch_69fe7f9ea5848190af5edd6d2d22c117 completed May 9, 2026, 12:28 a.m.
NED2 Entity disambiguation (via description) batch_69fe7ff91dec8190aa9f0d42a8cd00e0 completed May 9, 2026, 12:29 a.m.
Created at: April 10, 2026, 2:11 a.m.