Triple

T14900954
Position Surface form Disambiguated ID Type / Status
Subject M60 motorway E360001 entity
Predicate connectsTo P845 FINISHED
Object M56 motorway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M56 motorway | Statement: [M60 motorway, connectsTo, M56 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M56 motorway
Context triple: [M60 motorway, connectsTo, M56 motorway]
  • A. M56 motorway chosen
    The M56 motorway is a major road in North West England that connects Manchester to North Wales and serves as a key route to Manchester Airport.
  • B. M55 motorway
    The M55 motorway is a short English motorway in Lancashire that links the M6 near Preston to the seaside resort of Blackpool.
  • C. M58 motorway
    The M58 motorway is a key road in North West England that links the M6 near Wigan to the Liverpool area, providing an important route across Merseyside and Lancashire.
  • D. M65 motorway
    The M65 motorway is a key road in Lancashire, England, linking Preston with towns across East Lancashire and connecting to the wider UK motorway network.
  • E. M80 motorway
    The M80 motorway is a major road in Scotland connecting Glasgow to Stirling and forming part of the primary route between central Scotland and the north.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827980cbc8190a0c569ae3940a1d9 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69ded609bf68819099ca3aa3fe1acadc completed April 15, 2026, 12:04 a.m.
Created at: April 10, 2026, 2:11 a.m.