Triple

T14888086
Position Surface form Disambiguated ID Type / Status
Subject Kafue Gorge Dam E359679 entity
Predicate countryUsesPower P116209 FINISHED
Object Zambia national grid E352655 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zambia national grid | Statement: [Kafue Gorge Dam, countryUsesPower, Zambia national grid]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Zambia national grid
Context triple: [Kafue Gorge Dam, countryUsesPower, Zambia national grid]
  • A. Zimbabwe Power Company
    Zimbabwe Power Company is the state-owned utility responsible for generating electricity in Zimbabwe, operating major power stations including the Kariba hydroelectric facilities.
  • B. Zambia Railways network
    The Zambia Railways network is the national railway system of Zambia, linking major cities, mining regions, and neighboring countries for freight and passenger transport.
  • C. ZESCO chosen
    ZESCO is Zambia’s state-owned electricity utility company responsible for generating, transmitting, and distributing electric power across the country.
  • D. Energy Regulation Board of Zambia
    The Energy Regulation Board of Zambia is the national authority responsible for overseeing and regulating the country’s energy sector, including electricity, petroleum, and other energy services.
  • E. Western Province, Zambia
    Western Province, Zambia is a largely rural region in western Zambia known for its vast floodplains, traditional Lozi culture, and proximity to major wildlife areas such as Kafue National Park.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: countryUsesPower
Context triple: [Kafue Gorge Dam, countryUsesPower, Zambia national grid]
  • A. energyUse
    Indicates the amount or rate at which an entity consumes energy to perform its functions or activities.
  • B. electricityUse
    Indicates the amount or pattern of electrical energy consumed by an entity during a specified period or activity.
  • C. averageHouseholdsPoweredPerYear
    Indicates the typical number of households that can be supplied with power over the course of one year.
  • D. electrificationCoverage
    Indicates the extent to which a given area, system, or population is supplied with access to electrical power.
  • E. usedPowerplantsFrom
    Indicates that an entity has utilized or drawn energy from the specified power plants.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827980cbc8190a0c569ae3940a1d9 completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69ded5f6cf5c8190b6b28f58fafe5d59 completed April 15, 2026, 12:04 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe6b5f22c08190a9530cbd78cfc801 completed May 8, 2026, 11:01 p.m.
PD Predicate disambiguation batch_69de8c1a2bcc81908f914e2e2ced65eb completed April 14, 2026, 6:48 p.m.
PDg Predicate description generation batch_69de8f4c76e481909c0aa8d1a978e8d5 completed April 14, 2026, 7:02 p.m.
Created at: April 10, 2026, 2:08 a.m.