Triple

T14869406
Position Surface form Disambiguated ID Type / Status
Subject Strassenverkehrsamt des Kantons Zürich E349703 entity
Predicate instanceOf P0 FINISHED
Object cantonal road traffic authority C10843 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cantonal road traffic authority
Context triple: [Strassenverkehrsamt des Kantons Zürich, instanceOf, cantonal road traffic authority]
  • A. traffic authority chosen
    A traffic authority is an organization or governmental body responsible for planning, regulating, and managing road use, traffic flow, and transportation safety within a specific jurisdiction.
  • B. transport ministry
    The transport ministry is a government department responsible for planning, regulating, and overseeing a nation’s transportation systems and infrastructure, including roads, railways, air, and maritime transport.
  • C. division of a state transportation department
    A division of a state transportation department is an organizational unit responsible for managing specific functions—such as planning, construction, maintenance, or safety—within the broader mission of developing and operating the state's transportation system.
  • D. departmental road
    A departmental road is a public roadway managed and maintained by a specific administrative department or local authority, typically serving regional or intra-departmental traffic rather than national or major arterial routes.
  • E. toll road operator
    A toll road operator is an entity responsible for managing, maintaining, and collecting user fees on designated roadways or bridges, often under government concession or private ownership.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822ee4f408190b6ac3b2fa434f0df completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:55 a.m.