Triple

T14851038
Position Surface form Disambiguated ID Type / Status
Subject Denver park system E349226 entity
Predicate hasPart P35 FINISHED
Object Greenway Parkways system
The Greenway Parkways system is a network of interconnected parks, trails, and landscaped corridors in Denver designed to link neighborhoods with natural waterways and recreational green spaces.
E1123849 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Greenway Parkways system | Statement: [Denver park system, hasPart, Greenway Parkways system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Greenway Parkways system
Context triple: [Denver park system, hasPart, Greenway Parkways system]
  • A. Boulevard System South Parkways
    Boulevard System South Parkways is the southern segment of Chicago’s historic park and boulevard network, linking major parks through landscaped, tree-lined thoroughfares.
  • B. Boulevard System West Parkways
    Boulevard System West Parkways is a segment of Chicago’s historic park and boulevard network, comprising landscaped roadways that connect major parks on the city’s West Side.
  • C. Boulevard System North Parkways
    Boulevard System North Parkways is a segment of Chicago’s historic, landscaped boulevard network that links major parks through tree-lined thoroughfares and scenic drives.
  • D. Carriage Road system
    The Carriage Road system is a historic network of crushed-stone roads and stone bridges in Acadia National Park, originally financed by John D. Rockefeller Jr. for horse-drawn carriages and now popular for walking, biking, and skiing.
  • E. Charlotte beltway system
    The Charlotte beltway system is a circumferential highway network encircling Charlotte, North Carolina, designed to route traffic around the city and connect its major radial routes and suburbs.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Greenway Parkways system
Triple: [Denver park system, hasPart, Greenway Parkways system]
Generated description
The Greenway Parkways system is a network of interconnected parks, trails, and landscaped corridors in Denver designed to link neighborhoods with natural waterways and recreational green spaces.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Greenway Parkways system
Target entity description: The Greenway Parkways system is a network of interconnected parks, trails, and landscaped corridors in Denver designed to link neighborhoods with natural waterways and recreational green spaces.
  • A. Boulevard System South Parkways
    Boulevard System South Parkways is the southern segment of Chicago’s historic park and boulevard network, linking major parks through landscaped, tree-lined thoroughfares.
  • B. Boulevard System West Parkways
    Boulevard System West Parkways is a segment of Chicago’s historic park and boulevard network, comprising landscaped roadways that connect major parks on the city’s West Side.
  • C. Boulevard System North Parkways
    Boulevard System North Parkways is a segment of Chicago’s historic, landscaped boulevard network that links major parks through tree-lined thoroughfares and scenic drives.
  • D. Carriage Road system
    The Carriage Road system is a historic network of crushed-stone roads and stone bridges in Acadia National Park, originally financed by John D. Rockefeller Jr. for horse-drawn carriages and now popular for walking, biking, and skiing.
  • E. Charlotte beltway system
    The Charlotte beltway system is a circumferential highway network encircling Charlotte, North Carolina, designed to route traffic around the city and connect its major radial routes and suburbs.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822ed7e1881909b90fca143ad7e34 completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69ded441e70881909bbf62b66d932aff completed April 14, 2026, 11:56 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe6504ac6081908074231cf628fd39 completed May 8, 2026, 10:34 p.m.
NEDg Description generation batch_69fe65f41df08190ae7eee3b0235faf6 completed May 8, 2026, 10:38 p.m.
NED2 Entity disambiguation (via description) batch_69fe66f7b5a48190b5d31ac38e7300f9 completed May 8, 2026, 10:43 p.m.
Created at: April 10, 2026, 1:54 a.m.