Triple

T14849372
Position Surface form Disambiguated ID Type / Status
Subject Neubebauung des Augustusplatzes in Leipzig E349186 entity
Predicate instanceOf P0 FINISHED
Object architektonisches Gesamtprojekt C7141 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: architektonisches Gesamtprojekt
Context triple: [Neubebauung des Augustusplatzes in Leipzig, instanceOf, architektonisches Gesamtprojekt]
  • A. architectural design
    Architectural design is the conceptual and creative process of planning, organizing, and detailing the form, function, and aesthetics of built environments and structures.
  • B. architectural work chosen
    An architectural work is a designed and constructed building or structure that integrates functional, aesthetic, and technical elements to shape human environments and experiences.
  • C. architect
    An architect is a professional who plans, designs, and oversees the construction of buildings and other structures, balancing functionality, safety, aesthetics, and client needs.
  • D. visionary architecture project
    A visionary architecture project is a forward-thinking, often speculative design concept that reimagines the built environment through innovative forms, technologies, and social or ecological paradigms beyond conventional practice.
  • E. architecture work
    An architecture work is a tangible or digital artifact that represents the design, planning, or documentation of a built environment, such as drawings, models, specifications, or design narratives.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822ed7e1881909b90fca143ad7e34 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:53 a.m.