Triple

T14829112
Position Surface form Disambiguated ID Type / Status
Subject Ennore Port E348650 entity
Predicate instanceOf P0 FINISHED
Object coal-handling port C25562 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coal-handling port
Context triple: [Ennore Port, instanceOf, coal-handling port]
  • A. coal terminal chosen
    A coal terminal is a specialized facility at a port or rail hub designed for the receipt, storage, handling, and loading or unloading of coal for bulk transportation.
  • B. port crane
    A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
  • C. inland port
    An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
  • D. maritime cargo terminal
    A maritime cargo terminal is a specialized facility at a seaport where ships are loaded and unloaded, and cargo is temporarily stored, sorted, and transferred between sea and land transportation modes.
  • E. former port facility
    A former port facility is a decommissioned maritime infrastructure area that once supported cargo or passenger shipping operations but is no longer used for its original port functions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822eb8f588190bf53445e730a934f completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:51 a.m.