Triple

T14817360
Position Surface form Disambiguated ID Type / Status
Subject River Mill Dam E348351 entity
Predicate isPartOf P10 FINISHED
Object Clackamas River hydropower system E1091914 NE FINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Clackamas River hydropower system
Context triple: [River Mill Dam, isPartOf, Clackamas River hydropower system]
  • A. Clackamas River Hydroelectric Project chosen
    The Clackamas River Hydroelectric Project is a hydroelectric power system on Oregon’s Clackamas River that includes multiple dams and facilities generating renewable electricity.
  • B. Columbia River hydropower system
    The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
  • C. Mokelumne River Project (PG&E hydroelectric system)
    The Mokelumne River Project is a Pacific Gas and Electric Company hydroelectric system that harnesses the Mokelumne River through dams, reservoirs, and powerhouses to generate electricity and provide water storage in California.
  • D. Snake River hydropower system
    The Snake River hydropower system is a network of dams and related infrastructure along the Snake River that generates hydroelectric power, supports irrigation, and influences regional water management and ecosystems in the Pacific Northwest.
  • E. Deschutes Project
    The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

Stage Batch ID Job type Status
creating batch_69d822eb8f588190bf53445e730a934f elicitation completed
NER batch_69decfe2c1ec81908b3dff7a5d0e85d0 ner completed
NED1 batch_69fe3897691c819085ef89480e730723 ned_source_triple completed
Created at: April 10, 2026, 1:50 a.m.