Triple

T14783435
Position Surface form Disambiguated ID Type / Status
Subject Linach E347449 entity
Predicate hasPart P35 FINISHED
Object Linach Dam E1096685 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Linach Dam | Statement: [Linach, hasPart, Linach Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Linach Dam
Context triple: [Linach, hasPart, Linach Dam]
  • A. Rhodhiss Dam
    Rhodhiss Dam is a hydroelectric dam on the Catawba River in North Carolina that forms Lake Rhodhiss and helps provide power and water supply to the surrounding region.
  • B. Pitlochry Dam
    Pitlochry Dam is a mid-20th-century hydroelectric dam on the River Tummel in Scotland, noted for its power station and popular salmon ladder attraction.
  • C. Spavinaw Dam
    Spavinaw Dam is an early 20th-century concrete gravity dam in Oklahoma built to create Spavinaw Lake as a primary water supply source for the city of Tulsa.
  • D. Aviemore Dam
    Aviemore Dam is a major hydroelectric dam in New Zealand’s South Island, forming Lake Aviemore as part of the Waitaki River power scheme.
  • E. Linach dam chosen
    Linach dam is a historic gravity dam in the Black Forest region of Germany, known for its early 20th-century construction and scenic reservoir near the town of Vöhrenbach.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e9b9e08190bedcc31a163fda82 completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deca9f1c9c8190a8b28ba0ddd3e2e3 completed April 14, 2026, 11:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe24b626c48190a6aa9eda43539246 completed May 8, 2026, 6 p.m.
Created at: April 10, 2026, 1:31 a.m.