Triple

T14775053
Position Surface form Disambiguated ID Type / Status
Subject Gauguin's Pont-Aven period E347237 entity
Predicate instanceOf P0 FINISHED
Object phase of Paul Gauguin's career C34469 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: phase of Paul Gauguin's career
Context triple: [Gauguin's Pont-Aven period, instanceOf, phase of Paul Gauguin's career]
  • A. phase in Pablo Picasso's work
    A phase in Pablo Picasso's work is a distinct period in his artistic development characterized by a recognizable combination of style, technique, themes, and influences that differentiates it from other periods of his career.
  • B. post‑Impressionist painter
    A post-Impressionist painter is an artist who, building on Impressionism’s focus on light and color, emphasizes more expressive, symbolic, or structured forms to convey deeper emotional or conceptual content.
  • C. phase of Cubism
    A phase of Cubism is a distinct developmental period within the Cubist art movement, characterized by specific stylistic features, techniques, and thematic focuses that differentiate it from other stages of Cubist experimentation.
  • D. Neo-Impressionist painting
    A Neo-Impressionist painting is a late 19th-century artwork characterized by scientifically informed, methodical brushwork—often using small dots or strokes of pure color—to achieve luminous, optically mixed effects and harmonious compositions.
  • E. Post-Impressionist artwork
    A Post-Impressionist artwork is a late-19th to early-20th-century piece that builds on Impressionism’s use of color and light but emphasizes more structured composition, symbolic content, and expressive, often subjective, emotional impact.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e9b9e08190bedcc31a163fda82 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:31 a.m.