Triple

T14764462
Position Surface form Disambiguated ID Type / Status
Subject Sanjay Ghemawat E346957 entity
Predicate instanceOf P0 FINISHED
Object Google engineer C11479 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Google engineer
Context triple: [Sanjay Ghemawat, instanceOf, Google engineer]
  • A. Google employee chosen
    A Google employee is an individual hired by Google to contribute to the development, operation, or support of the company’s products, services, and internal functions within its organizational structure.
  • B. IBM employee
    An IBM employee is an individual who works for International Business Machines Corporation, contributing their skills and expertise to develop, support, or manage the company’s technology products, services, and operations.
  • C. Microsoft employee
    A Microsoft employee is an individual hired by Microsoft Corporation to contribute to the development, support, and operation of its software, hardware, and cloud-based products and services.
  • D. Google X project
    A Google X project is an experimental, high-risk, high-reward initiative within Alphabet’s research lab focused on developing breakthrough technologies that could have massive, long-term societal impact.
  • E. software engineer
    A software engineer is a professional who designs, develops, tests, and maintains software systems by applying principles of computer science and engineering to solve real-world problems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e8896c819091169882f9b20486 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:30 a.m.