Triple

T1476344
Position Surface form Disambiguated ID Type / Status
Subject Essex E30848 entity
Predicate hasMajorRoad P385 FINISHED
Object A120 road E377097 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A120 road | Statement: [Essex, hasMajorRoad, A120 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A120 road
Context triple: [Essex, hasMajorRoad, A120 road]
  • A. A120 road chosen
    The A120 road is a major route in Essex, England, linking the M11 motorway and Stansted Airport area to the A12 and the port town of Harwich.
  • B. A12 road
    The A12 road is a major trunk route in eastern England that connects London with coastal towns in Essex and Suffolk before continuing toward Norfolk.
  • C. A127 road
    The A127 road is a major primary route in Essex, England, linking East London with Southend-on-Sea and serving as a key commuter and arterial corridor.
  • D. A140 road
    The A140 road is a major route in eastern England that runs between Norfolk and Suffolk, connecting Norwich with Ipswich and serving as an important regional link.
  • E. A21 road
    The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a498fe55a88190ab7f9e40ace88e49 completed March 1, 2026, 7:52 p.m.
NER Named-entity recognition batch_69a4c603f9e88190b340734709534860 completed March 1, 2026, 11:04 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5e4aa62888190a5ef7a617b5ace8d completed March 14, 2026, 10:43 p.m.
Created at: March 1, 2026, 8:11 p.m.