Triple

T14744168
Position Surface form Disambiguated ID Type / Status
Subject IRT 42nd Street Shuttle E346424 entity
Predicate instanceOf P0 FINISHED
Object New York City Subway shuttle service C12143 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: New York City Subway shuttle service
Context triple: [IRT 42nd Street Shuttle, instanceOf, New York City Subway shuttle service]
  • A. New York City Subway–railroad interchange
    A New York City Subway–railroad interchange is a facility or location where subway lines physically connect with or provide direct transfer to mainline or commuter rail services, enabling passenger and sometimes equipment movement between the two systems.
  • B. New York City Subway infrastructure project
    A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
  • C. New York City Subway service designation chosen
    A New York City Subway service designation is a letter, number, or symbol that identifies a specific subway route, indicating its line, terminals, and general service pattern for riders.
  • D. New York City Subway tunnel
    A New York City Subway tunnel is an underground passageway engineered to safely guide subway trains, utilities, and related infrastructure beneath the city’s surface between stations.
  • E. New York City Subway transfer connection
    A New York City Subway transfer connection is a designated pathway or arrangement that allows passengers to move between different subway lines or stations within a single fare, facilitating efficient route changes and network connectivity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e6f1c88190bc494d491a907114 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:30 a.m.