Triple

T14732841
Position Surface form Disambiguated ID Type / Status
Subject RFK Bridge E346119 entity
Predicate chiefEngineer P616 FINISHED
Object Othmar Ammann E25240 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Othmar Ammann | Statement: [RFK Bridge, chiefEngineer, Othmar Ammann]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Othmar Ammann
Context triple: [RFK Bridge, chiefEngineer, Othmar Ammann]
  • A. Othmar Ammann chosen
    Othmar Ammann was a Swiss-American civil engineer renowned for designing many of New York City's major suspension bridges, including the George Washington Bridge.
  • B. Joseph Hellmesberger Jr.
    Joseph Hellmesberger Jr. was an Austrian violinist, conductor, and composer from the prominent Hellmesberger musical family, active in Vienna around the turn of the 20th century.
  • C. Gustav Lindenthal
    Gustav Lindenthal was an influential early 20th-century civil engineer renowned for designing major American steel bridges and advancing long-span bridge construction.
  • D. Hannes Meyer
    Hannes Meyer was a Swiss architect and urban planner who served as the second director of the Bauhaus, known for his functionalist, socially oriented approach to design and architecture.
  • E. Robert Maillart
    Robert Maillart was a pioneering Swiss civil engineer renowned for his innovative reinforced concrete bridge designs that transformed modern structural engineering.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e5911c8190ba589f957dbd9ba7 completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69dec72ea9348190817efcdaa973d7f7 completed April 14, 2026, 11:01 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe0ce3d1d88190951e88bef88db500 completed May 8, 2026, 4:18 p.m.
Created at: April 10, 2026, 1:29 a.m.