Triple

T14712460
Position Surface form Disambiguated ID Type / Status
Subject Strub system E345584 entity
Predicate instanceOf P0 FINISHED
Object railway technology C17465 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway technology
Context triple: [Strub system, instanceOf, railway technology]
  • A. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • B. railway technical standard chosen
    A railway technical standard is a formalized set of specifications and requirements that define the design, construction, operation, and maintenance criteria for railway systems to ensure safety, interoperability, and performance.
  • C. railway vehicle design
    Railway vehicle design is the engineering discipline focused on conceptualizing, developing, and optimizing rail vehicles for performance, safety, comfort, and compatibility with railway infrastructure and operations.
  • D. railway engineering complex
    A railway engineering complex is an integrated facility where railway infrastructure, rolling stock, and related systems are designed, constructed, tested, maintained, and managed.
  • E. rail
    A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e4a8c08190a155df736bb7bc13 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:28 a.m.