Triple

T14712459
Position Surface form Disambiguated ID Type / Status
Subject Strub system E345584 entity
Predicate instanceOf P0 FINISHED
Object rack railway system C14880 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rack railway system
Context triple: [Strub system, instanceOf, rack railway system]
  • A. rail
    A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
  • B. rail
    A rail is a long, continuous bar or track that provides guidance, support, or a running surface for vehicles, objects, or people in transportation or structural systems.
  • C. narrow-gauge railway line
    A narrow-gauge railway line is a railroad whose track gauge is significantly smaller than the standard gauge, typically used in regions with difficult terrain, lower construction costs, or specialized transport needs.
  • D. mountain rack railway chosen
    A mountain rack railway is a steep-gradient railway system that uses a toothed rack rail engaged by a cogwheel on the train to provide additional traction and braking on mountainous terrain.
  • E. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e4a8c08190a155df736bb7bc13 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:28 a.m.