Triple
T14712459
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Strub system |
E345584
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rack railway system |
C14880
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rack railway system Context triple: [Strub system, instanceOf, rack railway system]
-
A.
rail
A rail is a long, rigid bar or track, typically made of metal or wood, used to guide, support, or confine movement along a fixed path.
-
B.
rail
A rail is a long, continuous bar or track that provides guidance, support, or a running surface for vehicles, objects, or people in transportation or structural systems.
-
C.
narrow-gauge railway line
A narrow-gauge railway line is a railroad whose track gauge is significantly smaller than the standard gauge, typically used in regions with difficult terrain, lower construction costs, or specialized transport needs.
-
D.
mountain rack railway
chosen
A mountain rack railway is a steep-gradient railway system that uses a toothed rack rail engaged by a cogwheel on the train to provide additional traction and braking on mountainous terrain.
-
E.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822e4a8c08190a155df736bb7bc13 |
completed | April 9, 2026, 10:06 p.m. |
Created at: April 10, 2026, 1:28 a.m.