Triple

T14694028
Position Surface form Disambiguated ID Type / Status
Subject Resolution-class submarines E345106 entity
Predicate strategicSystem P94174 FINISHED
Object UK Polaris programme
The UK Polaris programme was Britain's Cold War-era nuclear deterrent initiative that deployed submarine-launched ballistic missiles on dedicated ballistic missile submarines.
E8571 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: UK Polaris programme | Statement: [Resolution-class submarines, strategicSystem, UK Polaris programme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: UK Polaris programme
Context triple: [Resolution-class submarines, strategicSystem, UK Polaris programme]
  • A. Barracuda programme
    The Barracuda programme is a French naval initiative to design and build a new generation of nuclear-powered attack submarines for the French Navy.
  • B. Trident successor programme
    The Trident successor programme is the United Kingdom’s initiative to replace its current fleet of nuclear-armed Vanguard-class submarines with new ballistic missile submarines to maintain the country’s continuous at-sea deterrent.
  • C. Tube Alloys programme
    The Tube Alloys programme was the secret British project during the Second World War to research and develop an atomic bomb, preceding and later merging into the American-led Manhattan Project.
  • D. British Army modernisation programme
    The British Army modernisation programme is a long-term initiative to transform the Army’s capabilities, equipment, and structure for contemporary and future warfare, including the introduction of advanced armoured vehicles, digital systems, and updated combat doctrines.
  • E. NATO Sea Sparrow Project
    The NATO Sea Sparrow Project is a multinational NATO initiative that coordinates the development, production, and deployment of the Sea Sparrow family of shipborne air-defense missile systems among member navies.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: UK Polaris programme
Triple: [Resolution-class submarines, strategicSystem, UK Polaris programme]
Generated description
The UK Polaris programme was Britain's Cold War-era nuclear deterrent initiative that deployed submarine-launched ballistic missiles on dedicated ballistic missile submarines.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: UK Polaris programme
Target entity description: The UK Polaris programme was Britain's Cold War-era nuclear deterrent initiative that deployed submarine-launched ballistic missiles on dedicated ballistic missile submarines.
  • A. Barracuda programme
    The Barracuda programme is a French naval initiative to design and build a new generation of nuclear-powered attack submarines for the French Navy.
  • B. Trident successor programme
    The Trident successor programme is the United Kingdom’s initiative to replace its current fleet of nuclear-armed Vanguard-class submarines with new ballistic missile submarines to maintain the country’s continuous at-sea deterrent.
  • C. Tube Alloys programme chosen
    The Tube Alloys programme was the secret British project during the Second World War to research and develop an atomic bomb, preceding and later merging into the American-led Manhattan Project.
  • D. British Army modernisation programme
    The British Army modernisation programme is a long-term initiative to transform the Army’s capabilities, equipment, and structure for contemporary and future warfare, including the introduction of advanced armoured vehicles, digital systems, and updated combat doctrines.
  • E. NATO Sea Sparrow Project
    The NATO Sea Sparrow Project is a multinational NATO initiative that coordinates the development, production, and deployment of the Sea Sparrow family of shipborne air-defense missile systems among member navies.
  • F. None of above.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: strategicSystem
Context triple: [Resolution-class submarines, strategicSystem, UK Polaris programme]
  • A. strategicResource
    Indicates that the related entity functions as a key asset whose control or availability significantly affects strategic or competitive advantage.
  • B. strategicCommand
    Indicates that one entity issues high-level, overarching directives or plans that guide the actions or decisions of another entity.
  • C. strategicStance
    Indicates the overarching strategic position, approach, or orientation an entity adopts in relation to others or to a particular situation.
  • D. strategicPrinciple
    Indicates that one entity embodies, expresses, or is governed by a guiding strategic principle in relation to another entity or context.
  • E. strategicStatus chosen
    Indicates the strategic condition or importance of an entity within a broader plan, context, or objective.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e34b348190ada4d1cdb6c7c226 completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb586e7108190be644db9cf9a4d99 completed April 14, 2026, 9:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69fde18e279c8190814f90e947734541 completed May 8, 2026, 1:13 p.m.
NEDg Description generation batch_69fde259ea5881909d48031a183ca614 completed May 8, 2026, 1:17 p.m.
NED2 Entity disambiguation (via description) batch_69fde2d0445881908b17fc24369ee90f completed May 8, 2026, 1:19 p.m.
PD Predicate disambiguation batch_69de6579fb7881909becc8f5822b39d4 completed April 14, 2026, 4:04 p.m.
Created at: April 10, 2026, 1:28 a.m.