Triple
T14693694
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thales Sonar 2076 suite |
E345099
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | sonar suite |
C31353
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: sonar suite Context triple: [Thales Sonar 2076 suite, instanceOf, sonar suite]
-
A.
security auditing tool
A security auditing tool is a software application that systematically scans, analyzes, and reports on systems, networks, or applications to identify security vulnerabilities, misconfigurations, and compliance issues.
-
B.
instrument suite
chosen
An instrument suite is a coordinated collection of scientific or measurement instruments designed to operate together for comprehensive data acquisition and analysis.
-
C.
code coverage instrumentation
Code coverage instrumentation is the process of inserting additional logic into a program’s code to record which parts are executed during tests or runtime, enabling measurement and analysis of test completeness.
-
D.
suite
A suite is a collection of related items—such as rooms, tests, or software components—grouped together to function as a coordinated whole.
-
E.
software assurance facility
A software assurance facility is an environment—comprising tools, processes, and infrastructure—dedicated to systematically evaluating, verifying, and improving software to ensure it meets defined quality, security, and reliability standards.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822e34b348190ada4d1cdb6c7c226 |
completed | April 9, 2026, 10:06 p.m. |
Created at: April 10, 2026, 1:28 a.m.