Triple
T14692167
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Thames passenger pier system |
E345060
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | river transport system |
C3393
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: river transport system Context triple: [Thames passenger pier system, instanceOf, river transport system]
-
A.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
B.
navigable waterway
chosen
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
C.
riverine trade route
A riverine trade route is a navigable waterway along a river system used for the transport and exchange of goods, people, and cultural influences between settlements.
-
D.
levee system
A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
-
E.
river structure
A river structure is any engineered or natural formation built in, on, or alongside a river to influence its flow, stability, navigation, or ecological function.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822e34b348190ada4d1cdb6c7c226 |
completed | April 9, 2026, 10:06 p.m. |
Created at: April 10, 2026, 1:28 a.m.