Triple

T14683091
Position Surface form Disambiguated ID Type / Status
Subject MTU Maintenance Zhuhai E344836 entity
Predicate instanceOf P0 FINISHED
Object aircraft engine maintenance, repair and overhaul company C28045 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: aircraft engine maintenance, repair and overhaul company
Context triple: [MTU Maintenance Zhuhai, instanceOf, aircraft engine maintenance, repair and overhaul company]
  • A. aircraft maintenance company
    An aircraft maintenance company is an organization that inspects, repairs, overhauls, and services aircraft and their components to ensure safety, reliability, and regulatory compliance.
  • B. aircraft engine manufacturer
    An aircraft engine manufacturer is a company that designs, develops, produces, and supports engines specifically for use in airplanes and other aircraft.
  • C. maintenance, repair and overhaul provider chosen
    A maintenance, repair and overhaul provider is an organization that performs inspection, servicing, repair, and refurbishment of equipment or systems to ensure their continued safe, reliable, and efficient operation.
  • D. aerostructures manufacturer
    An aerostructures manufacturer designs, engineers, and produces critical aircraft structural components—such as fuselages, wings, and empennages—for commercial, military, and aerospace applications.
  • E. military aircraft engine
    A military aircraft engine is a high-performance propulsion system designed to power combat and support aircraft, optimized for thrust, reliability, maneuverability, and operation under extreme conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e34b348190ada4d1cdb6c7c226 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:28 a.m.