Triple
T14667809
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Executive Post Graduate Programme in Management |
E344424
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | MBA-equivalent programme |
C506
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: MBA-equivalent programme Context triple: [Executive Post Graduate Programme in Management, instanceOf, MBA-equivalent programme]
-
A.
graduate program
chosen
A graduate program is an advanced course of study beyond the bachelor’s degree that provides specialized education, training, and research opportunities leading to a master’s or doctoral degree or professional qualification.
-
B.
professional experience program
A professional experience program is a structured initiative that provides participants with practical, real-world work exposure, skill development, and mentorship in a specific industry or field.
-
C.
fellowship program
A fellowship program is a structured, time-bound opportunity that provides individuals with financial support, mentorship, and professional development to advance their skills, research, or leadership in a specific field.
-
D.
interdisciplinary program
An interdisciplinary program is an academic course of study that integrates methods, perspectives, and content from multiple disciplines to address complex questions or problems that cannot be fully understood through a single field alone.
-
E.
professional degree
A professional degree is an academic credential specifically designed to prepare individuals for entry into a particular profession by combining theoretical knowledge with practical, career-focused training.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822e283fc8190a0e4c235cf880052 |
completed | April 9, 2026, 10:06 p.m. |
Created at: April 10, 2026, 1:27 a.m.