Triple

T1464965
Position Surface form Disambiguated ID Type / Status
Subject IJssel E27000 entity
Predicate distinguishedFrom P1612 FINISHED
Object Oude IJssel E228635 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Oude IJssel | Statement: [IJssel, distinguishedFrom, Oude IJssel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Oude IJssel
Context triple: [IJssel, distinguishedFrom, Oude IJssel]
  • A. Hollandsche IJssel
    Hollandsche IJssel is a river in the western Netherlands that flows through the provinces of South Holland and Utrecht and plays a role in regional water management and flood control.
  • B. Gelderse IJssel chosen
    Gelderse IJssel is the Dutch name for the branch of the River IJssel that flows through the province of Gelderland in the Netherlands.
  • C. Oude Maas
    The Oude Maas is a major distributary river in the western Netherlands that forms part of the complex Rhine–Meuse–Scheldt delta system.
  • D. Vaartsche Rijn
    Vaartsche Rijn is a historic canal in the Dutch province of Utrecht that connects the city of Utrecht with the Lower Rhine and forms part of its inland waterway network.
  • E. Beneden Merwede
    Beneden Merwede is a major distributary branch of the Rhine–Meuse river system in the western Netherlands, important for inland shipping and regional water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a496d25d6881909dbd84f86d763992 completed March 1, 2026, 7:43 p.m.
NER Named-entity recognition batch_69a4c5ba2d5c81909ee85713de961fcb completed March 1, 2026, 11:03 p.m.
NED1 Entity disambiguation (via context triple) batch_69ae26de62d48190849540112614ccce completed March 9, 2026, 1:48 a.m.
Created at: March 1, 2026, 8:01 p.m.