Triple

T14640506
Position Surface form Disambiguated ID Type / Status
Subject Cirque du Freak: The Vampire’s Assistant E343707 entity
Predicate productionCompany P490 FINISHED
Object Donners’ Company NE GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Donners’ Company
Context triple: [Cirque du Freak: The Vampire’s Assistant, productionCompany, Donners’ Company]
  • A. The Donners' Company chosen
    The Donners' Company is a film production company best known for producing major Hollywood movies, including entries in the X-Men franchise and other popular studio films.
  • B. Nathaniel McKay Company
    Nathaniel McKay Company was an architectural and engineering firm known for designing Guyana’s iconic Stabroek Market in Georgetown.
  • C. Duke’s Company
    Duke’s Company was a prominent 17th-century English theatre company, originally granted a royal patent after the Restoration and known for staging many of the era’s leading plays and performers.
  • D. Charles Connell and Company
    Charles Connell and Company was a prominent Scottish shipbuilding firm known for constructing large iron and steel sailing ships and steamers during the late 19th and early 20th centuries.
  • E. Bonbright and Company
    Bonbright and Company was a prominent early 20th-century American investment banking firm known for its work in public utilities and infrastructure finance.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822e1a2cc81908e5bb93cf61ce3cc completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:26 a.m.