Triple

T14636350
Position Surface form Disambiguated ID Type / Status
Subject 1991 Oakland-Berkeley firestorm E343616 entity
Predicate economicCost P115145 FINISHED
Object over 1.5 billion US dollars (1991) in direct damages LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: over 1.5 billion US dollars (1991) in direct damages | Statement: [1991 Oakland-Berkeley firestorm, economicCost, over 1.5 billion US dollars (1991) in direct damages]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: economicCost
Context triple: [1991 Oakland-Berkeley firestorm, economicCost, over 1.5 billion US dollars (1991) in direct damages]
  • A. estimatedCost
    Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.
  • B. programCost
    Indicates the monetary or resource expenditure required to implement, run, or participate in a particular program.
  • C. constructionCost
    Indicates the monetary or resource expenditure required to build or construct something.
  • D. humanCost
    Indicates the extent of harm, suffering, or loss experienced by people as a consequence of an action, event, or decision.
  • E. costModel
    Indicates the pricing or cost-structure relationship applied to an entity, defining how its costs are calculated or charged.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dffc3c8190aa173b90761bffda completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb4ab9578819085b4cf7244d30d87 completed April 14, 2026, 9:42 p.m.
PD Predicate disambiguation batch_69de657359c88190b082e3e9f86fc1d7 completed April 14, 2026, 4:04 p.m.
PDg Predicate description generation batch_69de716c17cc8190aeb85296abee85a7 completed April 14, 2026, 4:55 p.m.
Created at: April 10, 2026, 1:26 a.m.