Triple

T14633469
Position Surface form Disambiguated ID Type / Status
Subject Calstock railway station E343540 entity
Predicate line P1293 FINISHED
Object Tamar Valley Line E346951 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tamar Valley Line | Statement: [Calstock railway station, line, Tamar Valley Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tamar Valley Line
Context triple: [Calstock railway station, line, Tamar Valley Line]
  • A. Tamar Valley Line chosen
    The Tamar Valley Line is a scenic rural railway route in Devon and Cornwall, England, running along the River Tamar and connecting Plymouth with the town of Gunnislake.
  • B. Avon Valley Line
    The Avon Valley Line is a railway route in southwest England that follows the River Avon, connecting key towns and cities in the region.
  • C. Looe Valley Line
    The Looe Valley Line is a scenic rural railway in Cornwall, England, running along the Looe River between Liskeard and the coastal town of Looe.
  • D. Aberdare Line
    The Aberdare Line is a commuter rail route in South Wales that connects the town of Aberdare with Cardiff and other Valleys communities.
  • E. Crouch Valley Line
    Crouch Valley Line is a rural railway branch line in Essex, England, running between Wickford and Southminster and serving communities along the River Crouch.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dffc3c8190aa173b90761bffda completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb4aa7cb48190b008bd6b0e162c89 completed April 14, 2026, 9:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69fdf078c1248190889ce04cffbf51dc completed May 8, 2026, 2:17 p.m.
Created at: April 10, 2026, 1:26 a.m.