Triple

T14616502
Position Surface form Disambiguated ID Type / Status
Subject Atchafalaya River E343099 entity
Predicate partOf P40 FINISHED
Object Mississippi River and Tributaries Project
The Mississippi River and Tributaries Project is a comprehensive U.S. Army Corps of Engineers flood-control and navigation system designed to manage the flow and reduce flooding risks throughout the lower Mississippi River basin.
E1110116 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mississippi River and Tributaries Project | Statement: [Atchafalaya River, partOf, Mississippi River and Tributaries Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mississippi River and Tributaries Project
Context triple: [Atchafalaya River, partOf, Mississippi River and Tributaries Project]
  • A. Yazoo Backwater Project
    The Yazoo Backwater Project is a long-debated U.S. Army Corps of Engineers flood-control initiative in Mississippi’s Yazoo River basin, best known for its controversial proposed pumping station and its environmental and political disputes.
  • B. Tennessee Valley Authority Norris Dam project
    The Tennessee Valley Authority Norris Dam project was a major New Deal-era hydroelectric and flood-control initiative on the Clinch River in Tennessee that created Norris Dam, Norris Lake, and surrounding recreational and conservation areas.
  • C. Sac River flood control project
    The Sac River flood control project is a U.S. Army Corps of Engineers initiative in southwestern Missouri designed to reduce flooding along the Sac River and its tributaries through infrastructure such as Stockton Lake and its dam.
  • D. Red River flood control system
    The Red River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water flow, reduce flooding, and support water supply and recreation along the Red River.
  • E. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mississippi River and Tributaries Project
Triple: [Atchafalaya River, partOf, Mississippi River and Tributaries Project]
Generated description
The Mississippi River and Tributaries Project is a comprehensive U.S. Army Corps of Engineers flood-control and navigation system designed to manage the flow and reduce flooding risks throughout the lower Mississippi River basin.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mississippi River and Tributaries Project
Target entity description: The Mississippi River and Tributaries Project is a comprehensive U.S. Army Corps of Engineers flood-control and navigation system designed to manage the flow and reduce flooding risks throughout the lower Mississippi River basin.
  • A. Yazoo Backwater Project
    The Yazoo Backwater Project is a long-debated U.S. Army Corps of Engineers flood-control initiative in Mississippi’s Yazoo River basin, best known for its controversial proposed pumping station and its environmental and political disputes.
  • B. Tennessee Valley Authority Norris Dam project
    The Tennessee Valley Authority Norris Dam project was a major New Deal-era hydroelectric and flood-control initiative on the Clinch River in Tennessee that created Norris Dam, Norris Lake, and surrounding recreational and conservation areas.
  • C. Sac River flood control project
    The Sac River flood control project is a U.S. Army Corps of Engineers initiative in southwestern Missouri designed to reduce flooding along the Sac River and its tributaries through infrastructure such as Stockton Lake and its dam.
  • D. Red River flood control system
    The Red River flood control system is an integrated network of dams, reservoirs, and related infrastructure designed to manage water flow, reduce flooding, and support water supply and recreation along the Red River.
  • E. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dec68081908c2553145c4051dc completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb46439b88190a4affcc7ccedab6b completed April 14, 2026, 9:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69fda922f29c8190af98a8241d86f7cd completed May 8, 2026, 9:13 a.m.
NEDg Description generation batch_69fdb26b3ec481909c37e56eca8c7a82 completed May 8, 2026, 9:52 a.m.
NED2 Entity disambiguation (via description) batch_69fdb34d945c8190a464c0d4e5612ceb completed May 8, 2026, 9:56 a.m.
Created at: April 10, 2026, 1:25 a.m.