Triple

T14615753
Position Surface form Disambiguated ID Type / Status
Subject Tumut 3 Power Station E343080 entity
Predicate usesUpperReservoir P107038 FINISHED
Object Talbingo Reservoir E426249 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Talbingo Reservoir | Statement: [Tumut 3 Power Station, usesUpperReservoir, Talbingo Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Talbingo Reservoir
Context triple: [Tumut 3 Power Station, usesUpperReservoir, Talbingo Reservoir]
  • A. Talbingo Dam chosen
    Talbingo Dam is a major rockfill embankment dam in New South Wales, Australia, forming part of the Snowy Mountains Scheme and creating Talbingo Reservoir for hydroelectric power generation and water storage.
  • B. Enoggera Reservoir
    Enoggera Reservoir is a historic artificial lake and popular recreation area in Brisbane, Queensland, used for water supply, swimming, kayaking, and bushwalking.
  • C. Kangaroo Creek Reservoir
    Kangaroo Creek Reservoir is a major water storage and flood mitigation dam on the River Torrens in South Australia, supplying drinking water and recreational opportunities to the Adelaide region.
  • D. Eucumbene Dam
    Eucumbene Dam is a major rock-fill embankment dam in New South Wales, Australia, forming part of the Snowy Mountains Scheme and impounding Lake Eucumbene for hydroelectric power generation and water storage.
  • E. Blowering Reservoir
    Blowering Reservoir is a major water storage and hydroelectric facility on the Tumut River in New South Wales, Australia, used for irrigation, power generation, and flood mitigation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usesUpperReservoir
Context triple: [Tumut 3 Power Station, usesUpperReservoir, Talbingo Reservoir]
  • A. usesReservoir chosen
    Indicates that one entity draws upon, depends on, or operates using a particular reservoir as a resource or source.
  • B. hasMajorReservoir
    Indicates that an entity possesses or is associated with a primary or significant reservoir (such as a large storage or accumulation of a resource).
  • C. majorReservoir
    Indicates that one entity functions as a primary or significant water-storage reservoir associated with another entity.
  • D. reservoir
    Indicates that one entity serves as a storage or containment source (often for a resource) that can supply or affect another entity.
  • E. downstreamReservoir
    Indicates that one reservoir is located downstream of, and receives water flow from, another reservoir in a connected water system.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dec68081908c2553145c4051dc completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb46439b88190a4affcc7ccedab6b completed April 14, 2026, 9:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69fda922f29c8190af98a8241d86f7cd completed May 8, 2026, 9:13 a.m.
PD Predicate disambiguation batch_69de656f9f4c81909f815b6629a9ee39 completed April 14, 2026, 4:03 p.m.
Created at: April 10, 2026, 1:25 a.m.