Triple
T14613461
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | COA |
E343016
|
entity |
| Predicate | operatorMergerCompletionYear |
P176
|
FINISHED |
| Object | 2010 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2010 | Statement: [COA, operatorMergerCompletionYear, 2010]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: operatorMergerCompletionYear Context triple: [COA, operatorMergerCompletionYear, 2010]
-
A.
organCompletionYear
Indicates the year in which an organ (such as a musical organ or similar instrument) was fully completed or finished.
-
B.
originalCompletionYear
Indicates the year in which something (such as a project, work, or construction) was first fully completed.
-
C.
mergerYear
chosen
Indicates the year in which two or more entities formally merged into a single entity.
-
D.
acquisitionCompletedYear
Indicates the calendar year in which an acquisition transaction was fully completed.
-
E.
spireCompletionYear
Indicates the year in which the spire of a structure was completed.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822dec68081908c2553145c4051dc |
completed | April 9, 2026, 10:06 p.m. |
| NER | Named-entity recognition | batch_69deb45264988190a1df13e8b54a85bd |
completed | April 14, 2026, 9:40 p.m. |
| PD | Predicate disambiguation | batch_69de656f9f4c81909f815b6629a9ee39 |
completed | April 14, 2026, 4:03 p.m. |
Created at: April 10, 2026, 1:25 a.m.