Triple

T14613461
Position Surface form Disambiguated ID Type / Status
Subject COA E343016 entity
Predicate operatorMergerCompletionYear P176 FINISHED
Object 2010 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2010 | Statement: [COA, operatorMergerCompletionYear, 2010]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatorMergerCompletionYear
Context triple: [COA, operatorMergerCompletionYear, 2010]
  • A. organCompletionYear
    Indicates the year in which an organ (such as a musical organ or similar instrument) was fully completed or finished.
  • B. originalCompletionYear
    Indicates the year in which something (such as a project, work, or construction) was first fully completed.
  • C. mergerYear chosen
    Indicates the year in which two or more entities formally merged into a single entity.
  • D. acquisitionCompletedYear
    Indicates the calendar year in which an acquisition transaction was fully completed.
  • E. spireCompletionYear
    Indicates the year in which the spire of a structure was completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dec68081908c2553145c4051dc completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb45264988190a1df13e8b54a85bd completed April 14, 2026, 9:40 p.m.
PD Predicate disambiguation batch_69de656f9f4c81909f815b6629a9ee39 completed April 14, 2026, 4:03 p.m.
Created at: April 10, 2026, 1:25 a.m.