Triple

T1459050
Position Surface form Disambiguated ID Type / Status
Subject Michael Lee-Chin Crystal E31466 entity
Predicate instanceOf P0 FINISHED
Object glass-and-steel structure C5508 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: glass-and-steel structure
Context triple: [Michael Lee-Chin Crystal, instanceOf, glass-and-steel structure]
  • A. steel arch bridge
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • B. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • C. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • D. exhibition pavilion chosen
    An exhibition pavilion is a temporary or permanent standalone structure designed to showcase artworks, products, ideas, or cultural content within exhibitions, fairs, or public events.
  • E. double-decked bridge
    A double-decked bridge is a bridge structure with two vertically stacked levels of roadway, rail, or pedestrian paths designed to separate and manage different types or directions of traffic.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49917dfc081909acdbdf5d684f1ef completed March 1, 2026, 7:52 p.m.
Created at: March 1, 2026, 8 p.m.