Triple

T14579702
Position Surface form Disambiguated ID Type / Status
Subject Kataragama E342153 entity
Predicate transportAccess P1288 FINISHED
Object A4 highway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A4 highway | Statement: [Kataragama, transportAccess, A4 highway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A4 highway
Context triple: [Kataragama, transportAccess, A4 highway]
  • A. A4 highway chosen
    The A4 highway is a major road route that connects with the A2 coastal highway, serving as an important link in the regional transportation network.
  • B. A5 highway
    The A5 highway is a major Sri Lankan roadway that runs through the central highlands, providing key access to the hill country region including Nuwara Eliya.
  • C. A3 highway
    The A3 highway is a major roadway in Zimbabwe that serves as a key transport route linking the city of Mutare with other important regions and border crossings.
  • D. A3 highway
    The A3 highway is a major Nigerian roadway that runs through several northern states, including Bauchi, serving as an important regional transport corridor.
  • E. A6 Highway
    The A6 Highway is a major road in Zimbabwe that serves as a key transport route through Beitbridge District, facilitating regional and cross-border travel and trade.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822ddc0f081909cd8163c7de298cd completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb3f6f78c81908a30ecb4c025299d completed April 14, 2026, 9:39 p.m.
Created at: April 10, 2026, 1:24 a.m.