Triple

T14573247
Position Surface form Disambiguated ID Type / Status
Subject Cherokee County, Georgia E341972 entity
Predicate metroStatus P80476 FINISHED
Object core part of Atlanta–Sandy Springs–Alpharetta metropolitan statistical area LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: core part of Atlanta–Sandy Springs–Alpharetta metropolitan statistical area | Statement: [Cherokee County, Georgia, metroStatus, core part of Atlanta–Sandy Springs–Alpharetta metropolitan statistical area]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: metroStatus
Context triple: [Cherokee County, Georgia, metroStatus, core part of Atlanta–Sandy Springs–Alpharetta metropolitan statistical area]
  • A. railStatus
    Indicates the current operational condition or state of a rail-related entity (such as a track, line, or service) within the system.
  • B. publicTransportStatus
    Indicates the current operational condition or availability of a public transportation service or route.
  • C. cityCenterStatus chosen
    Indicates whether a location holds the status of being the central or main area of a city.
  • D. metroLineInaugurated
    Indicates that a metro line was officially opened and began operation on a specific date or during a specific event.
  • E. railLineStatusAfterward
    Indicates the condition or operational status of a rail line after a specified event or time period has occurred.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dcc6248190bed689984bceb0e2 completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb3f33b1c8190bb447788bfd28d51 completed April 14, 2026, 9:38 p.m.
PD Predicate disambiguation batch_69de656a953481909a4645b004c40de7 completed April 14, 2026, 4:03 p.m.
Created at: April 10, 2026, 1:24 a.m.