Triple

T14562817
Position Surface form Disambiguated ID Type / Status
Subject Emissario del Lago Albano E341708 entity
Predicate instanceOf P0 FINISHED
Object artificial drainage tunnel C6500 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: artificial drainage tunnel
Context triple: [Emissario del Lago Albano, instanceOf, artificial drainage tunnel]
  • A. water supply tunnel
    A water supply tunnel is an underground passage constructed to convey water from its source to treatment facilities, storage reservoirs, or distribution networks, often over long distances and through challenging terrain.
  • B. drainage channel chosen
    A drainage channel is a constructed or natural linear feature designed to collect and convey excess surface or subsurface water away from an area to prevent flooding, erosion, or waterlogging.
  • C. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • D. rail tunnel
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • E. road tunnel
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822dcc6248190bed689984bceb0e2 completed April 9, 2026, 10:06 p.m.
Created at: April 10, 2026, 1:23 a.m.