Triple

T14556221
Position Surface form Disambiguated ID Type / Status
Subject Rennes Metro E341548 entity
Predicate secondLineOpeningDate P80363 FINISHED
Object 2022-09-20 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2022-09-20 | Statement: [Rennes Metro, secondLineOpeningDate, 2022-09-20]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: secondLineOpeningDate
Context triple: [Rennes Metro, secondLineOpeningDate, 2022-09-20]
  • A. openingDate_Line2
    Indicates the secondary or alternative date on which something (such as a facility, service, or event) is opened or becomes operational.
  • B. firstLineOpeningDate
    Indicates the date on which the first line in a system, network, or service was officially opened or began operation.
  • C. line2OpeningDate chosen
    Indicates the date on which the second line (e.g., a route, service, or facility line) was officially opened or began operation.
  • D. lineSectionOpeningDate
    Indicates the date on which a specific section of a line (e.g., a route, track, or corridor) was officially opened for use.
  • E. fullLineOpeningDate
    Indicates the date on which an entire line (such as a route, service, or system) was officially opened for operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d822db9c8481908213ceb39585f792 completed April 9, 2026, 10:06 p.m.
NER Named-entity recognition batch_69deb2f1490881908673f429e5288c86 completed April 14, 2026, 9:34 p.m.
PD Predicate disambiguation batch_69de5c57489c8190b57917be1dba6ae6 completed April 14, 2026, 3:25 p.m.
Created at: April 10, 2026, 1:23 a.m.