Triple
T14548499
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Doha Expressway projects |
E341351
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road construction program |
C14043
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road construction program Context triple: [Doha Expressway projects, instanceOf, road construction program]
-
A.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
B.
public transit and highway improvement program
chosen
A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
-
C.
road safety program
A road safety program is an organized set of policies, education, engineering measures, and enforcement activities designed to prevent traffic accidents and reduce injuries and fatalities on roadways.
-
D.
highway funding program
A highway funding program is a structured governmental initiative that allocates financial resources for the planning, construction, maintenance, and improvement of highway infrastructure.
-
E.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822db9c8481908213ceb39585f792 |
completed | April 9, 2026, 10:06 p.m. |
Created at: April 10, 2026, 1:23 a.m.