Triple
T14505037
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | European freight corridor |
E340242
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | logistics network |
C34872
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: logistics network Context triple: [European freight corridor, instanceOf, logistics network]
-
A.
logistics module
A logistics module is a software component that manages the planning, execution, and tracking of the movement and storage of goods, information, and related resources across a supply chain.
-
B.
logistics code
A logistics code is a standardized identifier used to track, manage, and coordinate the movement, storage, and handling of goods and related operations across a supply chain.
-
C.
manufacturing network
A manufacturing network is an interconnected system of facilities, suppliers, technologies, and logistics that collaboratively plan, produce, and distribute goods across multiple locations.
-
D.
storage and distribution system
A storage and distribution system is an integrated arrangement of facilities, equipment, and processes designed to efficiently receive, store, manage, and deliver goods or resources to their intended destinations.
-
E.
logistical operation
A logistical operation is a coordinated set of activities and processes that plan, implement, and control the efficient movement and storage of goods, information, or resources from origin to destination.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d822d9c0408190b9a2b3643e58bb4d |
completed | April 9, 2026, 10:06 p.m. |
Created at: April 10, 2026, 1:21 a.m.