Triple

T1449632
Position Surface form Disambiguated ID Type / Status
Subject Omelek Island E31258 entity
Predicate launchInfrastructure P6820 FINISHED
Object transportable launch mount LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: transportable launch mount | Statement: [Omelek Island, launchInfrastructure, transportable launch mount]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: launchInfrastructure
Context triple: [Omelek Island, launchInfrastructure, transportable launch mount]
  • A. parallelInfrastructure
    Indicates that two or more infrastructure elements are arranged or operate in parallel to each other, typically serving similar functions simultaneously.
  • B. infrastructureManager
    Indicates a relationship where one entity is responsible for overseeing, maintaining, or administering the infrastructure of another entity or system.
  • C. usesInfrastructure chosen
    Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
  • D. launchProvider
    Indicates that one entity serves as the organization or company responsible for launching another entity (such as a spacecraft, satellite, or mission).
  • E. supportsInfrastructure
    Indicates that one entity provides resources, services, or capabilities that enable the operation, maintenance, or development of another entity’s infrastructure.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a499171a28819085b993a3ac78e363 completed March 1, 2026, 7:52 p.m.
NER Named-entity recognition batch_69a4c55d923c8190957756f834f94462 completed March 1, 2026, 11:01 p.m.
PD Predicate disambiguation batch_69a4c47a840c819083307a65c027a19e completed March 1, 2026, 10:58 p.m.
Created at: March 1, 2026, 8 p.m.