Triple
T14493460
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | O-1 (Australian context) |
E359424
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | NATO rank/pay grade |
C24955
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: NATO rank/pay grade Context triple: [O-1 (Australian context), instanceOf, NATO rank/pay grade]
-
A.
military pay grade
chosen
A military pay grade is a standardized classification that defines the level of compensation, rank, and seniority for service members within an armed forces pay system.
-
B.
military rank structure
A military rank structure is a hierarchical system that organizes service members into levels of authority and responsibility, defining command relationships, roles, and progression within the armed forces.
-
C.
army rank
An army rank is a formal level of authority and responsibility within a military hierarchy that defines a soldier’s position, duties, and chain-of-command relationships.
-
D.
air force rank
An air force rank is a formal level of authority and responsibility within an air force's hierarchical structure, used to organize personnel, define roles, and indicate seniority.
-
E.
military rank group
A military rank group is a classification that organizes individual military ranks into hierarchical categories based on authority, responsibility, and role within the armed forces structure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8279740308190af9df93a3af8592e |
completed | April 9, 2026, 10:26 p.m. |
Created at: April 10, 2026, 1:21 a.m.