Triple

T14486044
Position Surface form Disambiguated ID Type / Status
Subject The Good Soldier Švejk E359230 entity
Predicate numberOfPlannedParts P51752 FINISHED
Object 6 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 6 | Statement: [The Good Soldier Švejk, numberOfPlannedParts, 6]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: numberOfPlannedParts
Context triple: [The Good Soldier Švejk, numberOfPlannedParts, 6]
  • A. numberPlanned chosen
    Indicates that a specific quantity has been scheduled or intended for a future action or allocation.
  • B. numberOfRulesPlanned
    Indicates the planned or intended count of rules associated with an entity or process.
  • C. numberOfCompletedParts
    Indicates the count of parts within a whole that have been finished or fully completed.
  • D. plannedComponent
    Indicates that one entity is intended or scheduled to serve as a component or part of another entity in a planned or future configuration.
  • E. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8279740308190af9df93a3af8592e completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de924ee0f08190baf68318b41fa64d completed April 14, 2026, 7:15 p.m.
PD Predicate disambiguation batch_69de5c487b4c819097803e58dca628a5 completed April 14, 2026, 3:24 p.m.
Created at: April 10, 2026, 1:20 a.m.