Triple

T14480253
Position Surface form Disambiguated ID Type / Status
Subject Berryessa Transit Center E359083 entity
Predicate partOf P40 FINISHED
Object BART Silicon Valley extension E393030 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: BART Silicon Valley extension | Statement: [Berryessa Transit Center, partOf, BART Silicon Valley extension]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: BART Silicon Valley extension
Context triple: [Berryessa Transit Center, partOf, BART Silicon Valley extension]
  • A. BART Silicon Valley extension chosen
    The BART Silicon Valley extension is a major Bay Area Rapid Transit project extending rail service into Santa Clara County, including new stations in San José and surrounding areas.
  • B. BART Antioch extension corridor
    The BART Antioch extension corridor is the transit infrastructure corridor in eastern Contra Costa County that carries BART’s eBART service between Pittsburg/Bay Point and Antioch as part of the broader Antioch extension project.
  • C. Transbay BART network
    The Transbay BART network is the portion of the Bay Area Rapid Transit system that carries trains through the Transbay Tube between San Francisco and the East Bay, forming a critical regional rail link under San Francisco Bay.
  • D. San Francisco Central Subway project
    The San Francisco Central Subway project is a major Muni Metro light rail extension in San Francisco designed to improve north–south transit connectivity by linking neighborhoods such as SoMa, Union Square, and Chinatown.
  • E. BART Richmond–Millbrae+SFO line
    The BART Richmond–Millbrae+SFO line is a Bay Area Rapid Transit route that runs from Richmond in the East Bay through Oakland and San Francisco to Millbrae and San Francisco International Airport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d827966698819082e140837737501d completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de924a576c819098351efabdb779b1 completed April 14, 2026, 7:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd64a257488190818c65c1cc84c4b5 completed May 8, 2026, 4:20 a.m.
Created at: April 10, 2026, 1:20 a.m.