Triple

T14459465
Position Surface form Disambiguated ID Type / Status
Subject Scotland Route (Network Rail) E358543 entity
Predicate instanceOf P0 FINISHED
Object railway infrastructure management division C13555 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway infrastructure management division
Context triple: [Scotland Route (Network Rail), instanceOf, railway infrastructure management division]
  • A. railway infrastructure manager
    A railway infrastructure manager is an entity responsible for the planning, construction, maintenance, operation, and safe management of railway tracks, signaling systems, and related fixed installations.
  • B. railway infrastructure element
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • C. railway works section
    A railway works section is a defined segment of railway infrastructure and track, managed as a unit for construction, maintenance, and operational oversight.
  • D. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • E. railroad operating division chosen
    A railroad operating division is a geographically defined segment of a railway system managed as a unit for train operations, crew assignments, dispatching, and maintenance activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d82794dfa081909b9134ad2e32244b completed April 9, 2026, 10:26 p.m.
Created at: April 10, 2026, 1:19 a.m.