Triple

T14437837
Position Surface form Disambiguated ID Type / Status
Subject American River watershed E358009 entity
Predicate contains P35 FINISHED
Object Nimbus Dam E186071 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nimbus Dam | Statement: [American River watershed, contains, Nimbus Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nimbus Dam
Context triple: [American River watershed, contains, Nimbus Dam]
  • A. Nimbus Dam chosen
    Nimbus Dam is a concrete gravity dam on the American River in California that forms Lake Natoma and helps regulate water flow, provide hydroelectric power, and support regional water supply and recreation.
  • B. Ruskin Dam
    Ruskin Dam is a hydroelectric power-generating dam located on the Stave River in British Columbia, Canada.
  • C. Norris Dam
    Norris Dam is a Tennessee Valley Authority hydroelectric dam on the Clinch River in eastern Tennessee, notable as TVA’s first major dam project and a key component of regional flood control and power generation.
  • D. Bluestone Dam
    Bluestone Dam is a large concrete gravity dam on the New River in West Virginia, primarily used for flood control, recreation, and hydroelectric power generation.
  • E. Faraday Dam
    Faraday Dam is a hydroelectric dam located on the Clackamas River in Oregon, used for power generation and river flow management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8279402a88190821ffa39ae15bccf completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de914a45ec81909ab8ccf302047d7f completed April 14, 2026, 7:11 p.m.
NED1 Entity disambiguation (via context triple) batch_6a006065741c8190ad4ceb6bd3d60f9f completed May 10, 2026, 10:39 a.m.
Created at: April 10, 2026, 1:18 a.m.