Triple
T14434945
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Himayat Sagar Dam |
E357934
|
entity |
| Predicate | managesRiskOf |
P19221
|
FINISHED |
| Object | flooding in Hyderabad |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: flooding in Hyderabad | Statement: [Himayat Sagar Dam, managesRiskOf, flooding in Hyderabad]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: managesRiskOf Context triple: [Himayat Sagar Dam, managesRiskOf, flooding in Hyderabad]
-
A.
riskManagement
Indicates the implementation of strategies and actions to identify, assess, and mitigate potential risks associated with an entity or activity.
-
B.
riskManagedBy
chosen
Indicates that the potential or identified risk is controlled, mitigated, or overseen through the actions, policies, or responsibilities of a specified managing entity.
-
C.
riskManagementMechanism
Indicates a mechanism, process, or control used to identify, assess, mitigate, or monitor risks associated with an entity or activity.
-
D.
riskTypesManaged
Indicates that one entity is responsible for handling, controlling, or overseeing specific categories of risk associated with another entity or context.
-
E.
riskManagementGoal
Indicates the objective or desired outcome that guides how risks are identified, assessed, and controlled within a risk management process.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8279402a88190821ffa39ae15bccf |
completed | April 9, 2026, 10:26 p.m. |
| NER | Named-entity recognition | batch_69de9148cf4481909082cc91b2f76218 |
completed | April 14, 2026, 7:11 p.m. |
| PD | Predicate disambiguation | batch_69de5c3a02fc819097373f97a260cdeb |
completed | April 14, 2026, 3:24 p.m. |
Created at: April 10, 2026, 1:18 a.m.