Triple

T14434555
Position Surface form Disambiguated ID Type / Status
Subject Kgatleng District E357923 entity
Predicate hasFeature P182 FINISHED
Object Bokaa Dam
Bokaa Dam is a major water reservoir in Botswana that supplies drinking water and supports irrigation for communities in and around the Kgatleng District.
E1098430 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bokaa Dam | Statement: [Kgatleng District, hasFeature, Bokaa Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bokaa Dam
Context triple: [Kgatleng District, hasFeature, Bokaa Dam]
  • A. Ukai Dam
    Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • B. Koka Dam
    Koka Dam is a major hydroelectric and irrigation dam in Ethiopia that creates the Koka Reservoir on the Awash River.
  • C. Kindaruma Dam
    Kindaruma Dam is one of Kenya’s major hydroelectric power stations on the Tana River, contributing significantly to the country’s electricity generation.
  • D. Ikeda Dam
    Ikeda Dam is a major hydroelectric dam in Japan known for generating power and regulating water flow on the Yoshino River.
  • E. Shimen Dam
    Shimen Dam is a major concrete gravity dam in northern Taiwan that provides water supply, flood control, and hydroelectric power as part of the Shimen Reservoir system.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Bokaa Dam
Triple: [Kgatleng District, hasFeature, Bokaa Dam]
Generated description
Bokaa Dam is a major water reservoir in Botswana that supplies drinking water and supports irrigation for communities in and around the Kgatleng District.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Bokaa Dam
Target entity description: Bokaa Dam is a major water reservoir in Botswana that supplies drinking water and supports irrigation for communities in and around the Kgatleng District.
  • A. Ukai Dam
    Ukai Dam is a major multi-purpose reservoir and hydroelectric dam in Gujarat, India, built on the Tapi River for irrigation, power generation, and flood control.
  • B. Koka Dam
    Koka Dam is a major hydroelectric and irrigation dam in Ethiopia that creates the Koka Reservoir on the Awash River.
  • C. Kindaruma Dam
    Kindaruma Dam is one of Kenya’s major hydroelectric power stations on the Tana River, contributing significantly to the country’s electricity generation.
  • D. Ikeda Dam
    Ikeda Dam is a major hydroelectric dam in Japan known for generating power and regulating water flow on the Yoshino River.
  • E. Shimen Dam
    Shimen Dam is a major concrete gravity dam in northern Taiwan that provides water supply, flood control, and hydroelectric power as part of the Shimen Reservoir system.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8279402a88190821ffa39ae15bccf completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de91471a648190adb7b283a6a85c3e completed April 14, 2026, 7:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd5bd5b1d08190a89e6f004a94b361 completed May 8, 2026, 3:43 a.m.
NEDg Description generation batch_69fd5ca8e36c8190873d0e2a82f62623 completed May 8, 2026, 3:46 a.m.
NED2 Entity disambiguation (via description) batch_69fd5d46d974819085a43c51b414ff9a completed May 8, 2026, 3:49 a.m.
Created at: April 10, 2026, 1:18 a.m.