Triple

T14430808
Position Surface form Disambiguated ID Type / Status
Subject Kerr Lake E357822 entity
Predicate createdBy P806 FINISHED
Object Kerr Dam E659722 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kerr Dam | Statement: [Kerr Lake, createdBy, Kerr Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kerr Dam
Context triple: [Kerr Lake, createdBy, Kerr Dam]
  • A. Kerr Dam chosen
    Kerr Dam is a large hydroelectric and flood-control structure on the Roanoke River that creates Kerr Lake (also known as Buggs Island Lake) along the Virginia–North Carolina border.
  • B. O'Shaughnessy Dam
    O'Shaughnessy Dam is a concrete arch-gravity dam in Yosemite National Park that creates the Hetch Hetchy Reservoir, supplying water and hydroelectric power to the San Francisco Bay Area.
  • C. McPhee Dam
    McPhee Dam is a large earthen dam in southwestern Colorado that creates McPhee Reservoir, one of the state’s largest bodies of water, primarily for irrigation, flood control, and recreation.
  • D. Duncan Dam
    Duncan Dam is a major hydroelectric and flood-control dam on the Duncan River in British Columbia, forming part of the Columbia River Treaty system.
  • E. Gordon Dam
    Gordon Dam is a large concrete arch dam in Tasmania, Australia, best known for impounding Lake Gordon as part of a major hydroelectric power scheme.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8279402a88190821ffa39ae15bccf completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de914570f08190b1c7c1c57a0cb476 completed April 14, 2026, 7:11 p.m.
NED1 Entity disambiguation (via context triple) batch_6a004f3548b48190aec852723654bd35 completed May 10, 2026, 9:26 a.m.
Created at: April 10, 2026, 1:18 a.m.