Triple

T14429125
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 25 E357774 entity
Predicate hasJunctionWith P1018 FINISHED
Object Interstate 26 E389186 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 26 | Statement: [U.S. Route 25, hasJunctionWith, Interstate 26]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 26
Context triple: [U.S. Route 25, hasJunctionWith, Interstate 26]
  • A. Interstate 26 chosen
    Interstate 26 is a major east–west U.S. Interstate Highway in the Southeastern United States that connects the South Carolina coast to inland cities across South Carolina, North Carolina, and Tennessee.
  • B. Interstate 77
    Interstate 77 is a major north–south U.S. highway running from South Carolina through several states, including West Virginia and Ohio, to northeastern Ohio near Lake Erie.
  • C. Interstate 20
    Interstate 20 is a major east–west U.S. highway running from Texas to South Carolina, serving as a key transportation corridor across the southern United States.
  • D. Interstate 140
    Interstate 140 is a short auxiliary Interstate highway serving the Knoxville, Tennessee area, providing a connector route around the city.
  • E. Interstate 269
    Interstate 269 is a beltway freeway that forms part of the outer loop around the Memphis metropolitan area, improving regional connectivity and bypassing urban traffic.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8279402a88190821ffa39ae15bccf completed April 9, 2026, 10:26 p.m.
NER Named-entity recognition batch_69de91154de881909266ae88d1545685 completed April 14, 2026, 7:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69fde16198488190ad69eeebd09c45da completed May 8, 2026, 1:13 p.m.
Created at: April 10, 2026, 1:18 a.m.